NEWS
BOSTD received the title of "Innovative Small and Medium-sized Enterprise (SME)" from the Qingdao Municipal Bureau for Private Economic Development
2025
06
/
02
BOSTD's electrical maintenance team was awarded the honorary title of "Workers' Pioneer Team of Chengyang District."
05
Ecological Gabion Bank Protection Project
04
25
PP uniaixal geogrids for embankment in Fujian Province
18
Liangshui River Treatment Gabion Revetment
The Liangshui River treatment project aims to enhance cost efficiency, support forestation efforts, and improve the ecological environment. Our proposed design includes a pile-built wall gabion structure measuring 1m x 1m x 0.5m, using high-density polyethylene (HDPE) rope for binding. To achieve optimal performance, it is essential that all bidirectional grills exhibit consistent tensile strength and uniform carbon black content with evenly distributed pellets. Furthermore, careful consideration of the HDPE material's thickness range will be crucial to fulfilling our project requirements.
03
28
Tianjin Hai River - Geogrid Reinforced Retaining Wall
21
Stock Information
11
Mehmood Boti Pakistan Rehabilitation Dumpsite
Description:BOSTD's high-density polyethylene (HDPE) drainage grid system is a key component in the construction of the Mehmood Boti rehabilitation dumpsite in Pakistan. This durable product is engineered to withstand damage from acids and alkalis and boasts a lifespan exceeding 50 years, even in Pakistan's challenging hot and rainy climate. It also reduces maintenance costs by over 40% compared to traditional materials. The Mehmood Boti dumpsite is a vital project under the China-Pakistan Economic Corridor, set to effectively manage 3,000 tons of waste each day. This initiative exemplifies the integration of China’s leading environmental protection standards with the development goals of Belt and Road countries.
07