Mehmood Boti Pakistan Rehabilitation Dumpsite
Type of Project :Drainage Grid System
Material: HDPE
Date: 2025
Description:BOSTD's high-density polyethylene (HDPE) drainage grid system is a key component in the construction of the Mehmood Boti rehabilitation dumpsite in Pakistan. This durable product is engineered to withstand damage from acids and alkalis and boasts a lifespan exceeding 50 years, even in Pakistan's challenging hot and rainy climate. It also reduces maintenance costs by over 40% compared to traditional materials. The Mehmood Boti dumpsite is a vital project under the China-Pakistan Economic Corridor, set to effectively manage 3,000 tons of waste each day. This initiative exemplifies the integration of China’s leading environmental protection standards with the development goals of Belt and Road countries.
Location:Pakistan
Benefits:Reduce lifecycle maintenance costs , improve readability for technical requirements.
Add: No. 8 Ronghai 1st Road, Qingda Industrial Park, Chengyang District, Qingdao, Shandong,China
Tel: +86-10-82842590
E-mail:info@bostd.com
Copyright © BOSTD GEOSYNTHETICS