The Padma Bridge Railway Link Project - Bangladesh
The Padma Bridge Railway Link Project in Bangladesh represents a significant milestone in the country's ongoing infrastructure development, spanning approximately 170 km. This multipurpose bridge accommodates both rail and road traffic, operating at a speed of 120 km/h. The project includes a sub-grade foundation of 132.311 km, which accounts for 78% of the entire route. The rail link passes through densely populated areas where the sub-grade lacks adequate natural grading conditions.
2025
03
/
07
Welcome to Visit BOSTD Geosynthetics at GEOASIA8
We are excited to announce that BOSTD Geosynthetics will be participating in the prestigious GEOASIA8 exhibition! The event will take place at [insert venue details if available], and we cordially invite all our valued clients, partners, and industry professionals to visit us at **Booth 7**.
The Southern-Northern Highway: Montenegro
The Southern-Northern Expressway is the first highway in Montenegro, built by the China Communications Construction Company (CCCC) and the China Road & Bridge Corporation (CRBC). The highway spans approximately 180 kilometers and navigates some of the most challenging landscapes in Montenegro. Notably, about 60% of the route consists of tunnels and bridges.
02
28
BOSTD 2024 Year End Party
One of BOSTD’s tradition is to make all BOSTDers gather at the Year End Party - a night of camaraderie, celebration, and meaningful connections.
24
Hazardous Waste Center in Huizhou, Guangdong
Description:In Huizhou, Guangdong province, generates around 2000 millions of hazardous waste per year. BOSTD offered to protect the waterproofing system from additional damage, and help expel methane gas and other contaminants from underneath structures.
23
Haoji Railway
Description:The Haoji Railway was built exclusively for over-sized and over-weight cargo, with an operating length of 1,837 kilometers. BOSTED was in involved of design and build a transport capacity of 200 million tons per year. The project aimed to maintain the stability of the subgrade slope, therefore, BOSTD installed one layer of bidirectional Geogrid in every 60 centim
22
Qinghai - Tibet Railway Phase #31
The Qinghai-Tibet Railway is the world’s highest and longest railway on plateau. The railway represents a significant advancement in infrastructure, aimed at enhancing accessibly and fostering economic growth in the region. The Ministry of Railways claimed to construct a railway of high standards and quality while mitigate environmental impact of the Tibetan Plateau.
21
BOSTD 2025 Chinese New Year Greetings
BOSTD wishes a happy, prosperous, and lucky Year of Snake to all our customers, agents, friends, and colleagues!